先锋影音av资源站av I 成人18在线 I 最新日韩视频在线观看 I 五级片电影 I 日本猛少妇色xxxxx猛叫小说 I 国内一级黄色大片 I 色免费视频 I 体育生欲乱h淫体育会 I 少妇高潮久久久久久古代 I 色中色综合影院手机版在线观看 I 被强迫的爱人 I 久久成人在线观看 I 欧美视频在线播放一区 I 伊人成年网 I 欧美一级无毛 I 亚洲精品乱码久久久久久久久 I 欧洲熟妇色xxxx欧美老妇老头多毛 I 日本一区二区三区在线看 I 97超碰人人看 I 欧美性色老妇人 I 少妇被黑人4p到惨叫欧美人 I 成年人小视频网站 I 亚洲精品六区 I 亚洲人成图片小说网站 I 黑人一区二区三区四区五区 I 欧美视频国产精品 I 亚洲国产精品成人天堂 I 国产精品无码成人片 I 99热最新 I a级大片 I 欧美中文字幕一区二区三区 I 老女人一区 I 少妇人妻好深好紧精品无码 I www.蜜臀av I 天天天天 I 欧美在线观看视频在线 I 久久久久久精品成人鲁丝电影 I 黄视频网站全 I 李丽莎喷水国产一二区 I 国产国拍亚洲精品永久69 I 日本国产在线视频 I av资源网在线播放 I 少妇尤物高潮在线观看 I 香港男男中粗大巨gaysex I 超碰97人人做人人爱少妇 I 久久久专区 I 中国av毛片 I 秋霞理论在线视频 I 日本少妇性生活 I 精品福利网 I av免费网站 I 日韩av有码在线观看 I 怡春院av I 免费一区二区三区视频在线 I 亚洲高清视频在线 I 国产成a人片在线观看视频下载 I 极品美女开粉嫩精品

Hello, welcome to Xuzhou Tenglong Steel Structure Technology Co., Ltd. official website!

Your Current Location:Home > News > INDUSTRY DYNAMIC

Technical guarantee measures of steel structure workshop engineering
release time:2019/4/25 23:38:33      hit count:2238

Technical guarantee measures of steel structure workshop engineering

In order to ensure that the fabrication and installation of your steel structure meet the established standards, the following measures are hereby formulated:

1, in strict accordance with the "steel structure engineering construction and acceptance code" gb50205-2001 provisions of the material, line, material, group, welding technical requirements for the steel structure production, hoisting.

2, roof support, steel beam roof beam and other components according to 1:1 lofting, blanking, and considering the contraction of the weld.

3. H-shaped steel group vertical welding machine, submerged arc welding machine, h-shaped steel rectification machine, leveller and other equipment are used for processing, welding and rectification of h-shaped steel group.

4. The friction contact surface of components shall be constructed in accordance with the reasonable construction process. After treatment, the friction surface of components shall not be painted or defaced. The friction coefficient test adopts bolt specimen. The friction treatment, material, high-strength bolt and component are the same, and the friction coefficient is 0.45.

5. The bolt connection hole shall be drilled by CNC drilling machine and its pass rate shall be checked.

6. Pre-assembly of components before leaving the factory, and record the assembly.

7. Hoist steel column and other vertical long-shaped members with the lifting point at 2/3 of the column length. Hoisting roof truss beam and other components, the lifting point is set at equal distance from the key position.

8. Pay attention to the influence of wind force, sunshine temperature and temperature difference during alignment correction of steel column. Therefore, no correction shall be made when the wind force exceeds level 5. Install or reinforce the side beams of the corrected columns immediately. Calibration should be carried out in the morning or when the sun is cooler and in the environment.

9, the production of glass commissioned professional glass manufacturers production and processing. The production of glass shall be in accordance with the current national standards and specifications, and the owner shall confirm the product samples, and provide relevant test reports and supporting documents.

Before the installation of steel structure, the foundation shall be retested to ensure that it meets the installation requirements. During the installation of steel structure, the measurement and correction shall be carried out and the error shall be controlled within the allowed range.

11. Carry out a comprehensive self-correction and self-inspection in accordance with the installation manual and acceptance standards to prevent errors in the work. The quality inspector should make a detailed inspection and record of the work every day, and check the quality together with the owner's representative and on-site project supervisor.

12. Check the material and quality guarantee of the steel. The quality guarantee shall mainly pay attention to the data of yield point, cold bending, room temperature impact and carbon content.

13. Self-inspection and mutual inspection shall be carried out in the process of steel structure fabrication, and special inspection shall be carried out in strict accordance with the steel structure engineering quality inspection and evaluation standard gb50211-95.

18, h-shaped steel plate butt weld inspection, to meet the second-grade weld quality standards.

19. Code for construction and acceptance of steel structure: pay attention to the protection of finished product paint and deformation during transportation. The components are tied firmly, and the binding place is protected by rubber pad to avoid damage of ring paint. And according to the shape of transport vehicles, components of the production of supporting transport frame to prevent deformation.

20. Check the matching conditions of the column foundation axis, the column foot bolts and the bolt holes on the column bottom plate before lifting.

21. After hoisting the steel column, the surveyor shall timely measure, correct and prepare for hoisting the roof truss beam.


News you are interested in
Previous:Jiangsu steel structure development direction of four major advantages
Next:Construction technology of steel structure engineering

Back to list

主站蜘蛛池模板: 绥棱县| 霍林郭勒市| 赣州市| 宜川县| 凤冈县| 南乐县| 镇巴县| 历史| 安庆市| 田林县| 泽普县| 沧州市| 阿城市| 黑龙江省| 镇远县| 丹棱县| 丰顺县| 日照市| 泰宁县| 保德县| 黄大仙区| 车致| 澄迈县| 自贡市| 甘南县| 兰州市| 威海市| 贡山| 彭泽县| 泾川县| 福州市| 晴隆县| 保定市| 海南省| 同江市| 奉新县| 南安市| 阜阳市| 佛冈县| 老河口市| 信宜市|